Supply chain risk PolandRenewables EPC (Solar/Wind BOS)

Renewables EPC (Solar/Wind BOS) in Poland

A supplier in this country and this sector starts from a baseline risk of 55.5 out of 100 before anything specific to that company is known — the elevated band, and rank 853 of 1650 country-sector combinations in the Tieron reference catalog. Poland ranks 30 of 50 countries on composite country risk; Renewables EPC (Solar/Wind BOS) ranks 11 of 33 sectors on process risk. Every figure below shows its weight and its source.

Baseline risk
55.5
Elevated · of 100
Country composite
44.6
rank 30 of 50
Sector risk
66.5
rank 11 of 33
Axis covered
50%
of the risk axis by weight

Country risk — Poland

Four published indices, normalized to 0–100 risk and combined with the weights the catalog was generated with. Composite: 44.6.

FactorPublished valueRiskWeightSource
Labour rights violationITUC rating 3 (1 best – 5+ worst)50.00.35ITUC Global Rights Index 2025
Public-sector corruptionCPI 53 of 100 (higher = cleaner)47.00.25Transparency International CPI 2024
Environmental performanceEPI 64.2 of 100 (higher = better)35.80.20Yale EPI 2024
Rule of lawWGI 0.46 (−2.5 … 2.5)40.80.20World Bank WGI 2023

Sector risk — Renewables EPC (Solar/Wind BOS)

What the process itself carries, independent of where it runs. Sector score: 66.5. Japanese label: 再エネEPC(太陽光/風力BOS).

Sub-factorScoreRelative
Process hazard75.0
Labour intensity & informality70.0
Environmental load70.0
Upstream depth (tiers below)35.0
Regulatory exposure70.0

Natural hazard exposure — Poland

Site-level continuity risk, 0–10. These layers do not enter the baseline score above; they enter a supplier’s score once you give the site a location.

LayerValue (0–10)Relative
INFORM Risk (overall)2.5
Natural hazard2.8
Earthquake0.8
Flood5.9
Cyclone0.0
Drought2.8

What this page cannot tell you

Country and sector are 50% of Tieron’s risk axis by weight — the half that is knowable from public data alone. The rest is supplier-specific: conflict minerals exposure (weight 0.10), incident history (0.10) and information opacity (0.10). Impact — spend, substitution difficulty, continuity criticality — needs your own ledger. Upload a supplier list and those factors resolve per company, with the same provenance shown here.

Screen your supplier list against sanctions, debarment and UFLPA entity data free, or rank the whole list by impact x risk and pick the first assessment wave.Free sanctions check →Rank my supplier list →

Other sectors in Poland

Riskiest first, same country.

Renewables EPC (Solar/Wind BOS) in other countries

Riskiest first, same sector — the sourcing-shift comparison.

Get sanctions & UFLPA list updates
A short note when the lists change in ways that matter for supply-chain screening. No noise.
Method: baseline risk is the weighted mean of country composite risk (weight 0.15) and sector risk (weight 0.15), using the same weights and the same weighted-mean form as the Tieron scoring engine restricted to those two factors. It is deterministic: the same inputs always produce the same number.
Sources — country: Tieron catalog v1 — CPI 2024 / ITUC 2025 / EPI 2024 / WGI RoL 2023. Sector: Tieron catalog v1 — 33-sector reference (v6). Natural hazard: INFORM Risk Index 2025 (EC JRC, drmkc.jrc.ec.europa.eu/inform-index), 0–10 scale. Country and sector indices are published by their respective issuers; the sector reference is Tieron’s own catalog. Informational aid for supplier screening, not legal advice and not a statement about any individual company.